Archive for March, 2010

Stamp Duty - Budget 2010

Thursday, March 25th, 2010

The most notable change relating to property in the latest budget was, perhaps, the raising of the stamp duty levy to £250,000 and the increase in stamp duty payable to 5% for property over £1,000,000.

The raising of the stamp duty threshold is not, however, a blanket one. It only applies to first time buyers. In other words, as I understand it, to benefit, you must never have owned (either solely or jointly) any residential property at ant time anywhere in the world!

For non first time buyers, the existing stamp duty bands apply. In other words stamp duty at 1% will be levied on property transaction over £175,000 and under £250,000.

On top of this, the property you buy must used as your main residence. No living in rented accommodation and applying for the relief on a house bought as a buy to let.

If buying a property with another party, to qualify for the relief, none of the parties must have previously owned a property.

The relief applies to all completions as of now. Even if contracts were exchanged before the budget announcement, relief will be given assuming all the other criteria are met.

The changes are not, perhaps, as radical as they may have at first been seen. This is particularly the case when you consider that on a £250,000 property, the saving will be £2,500. I am not convinced this will provide the stimulus that the first time buyer market needs (most first time buyers will probably be buying property at much less than the £250,000 limit and so the savings will be less). Nevertheless, it can only be a step in the right direction.

Japanese Knotweed

Saturday, March 20th, 2010

There has been a fair bit of discussion on the TV and in newspapers recently about the ‘threat of Japanese Knotweed’. It is not something that, in 17 years of surveying, I have ever come accross. I thought I would do a bit of research, and this is what I have found:-

Japanese Knotweed is a member of the Japonica family. It has heart shaped leaves, a bamboo like stem and white flower clusters which appear in the late summer or early autumn. The hollow stems die back in the winter. The plant spreads from Rhizomes (small underground nodules). The plant can grow as much as 10cm a day! and reach 3m in height.

Japanese Knotweed was introduced from the Far East in the 19th century but spread rapidly. It has no natural ‘predators’ in this country so control is chemical based. It’s rapid growth has been known to cause damage to building floors and walls.

It is not illegal to have Japanese Knotweed in your garden but if you allow it to spread, you could cause a legal nuisance (a civil offence) for which damages might be awarded by a Court. It is an offence to dispose of the plant other than in a specified manner (under the Environmental Protection Act 1990).

In most cases, Japanese Knotweed can be controlled straightforwardly in a residential environment but knowledge is key. Residential development sites do need to be cleared of the plant before development and the costs of this can be high.

The plant has been in the news recently because trials have started using a natural pest which slows the growth and spread of the plant. This pest has been tested on native plants and crops (87 in total) to make sure it does not cause knock on environmental issues. Trials are in their early stages but, if successful, will help to reduce the estimated £150million a year costs of removal and clearance in the uk.

Advice you want

Thursday, March 4th, 2010

For many years, surveyors have been guilty of providing Building survey reports based on what we think you want. At Martin and Mortimer, we are trying to do our small bit to change that.

Eight years ago, we launched a Building survey with a Summarising report format. This was designed to give our clients the comfort of knowing that an experienced surveyor had looked at the property in detail whilst providing a report that is straight-forward to read and understand.

From those humble beginnings, the Building survey with Summarising report has risen to become our most popular product. We are not, however, ones to rest on our laurels. In 2007, we added ‘contingency repair costs’ to our reports. We felt that use of language such as a ’significant issue’ or serious defect’ was unhelpful but costs are something everyone can relate to.

We didn’t stop there, in Jan 2010, we changed the Conclusion to our Summarising report to include two tables. These pull together the contingency costs contained in the report and break them down in to urgent and non-urgent issues. This allows clients (at a glance) to distinguish between what needs doing now, and what can be done as part of planned maintenance.

The feedback we have had has been very encouraging but we are always open to new ideas. If you have had previous experience of other surveyors reports and think they offered something special, or if you want advice on what is included in the Building survey, let me know.


Powered by WordPress / Entries (RSS) / Comments (RSS) / Admin Login